Page 61 - DFB-2023-Annual-Report-Low-Res
P. 61

7.2 PROPERTY MANAGEMENT
The Property Maintenance Section is responsible for the
maintenance of all 18 DFB’s properties.                          CONSUMPTION (KWHS) - 2022

KEY ACTIVITY IN 2023 INCLUDED:                                   6,480,531
                                                                    KWhs
Development of the new logistics and workshop building in

Finglas with the property developer

Assisted with the design and development of the new Alfie

Byrne Road Station

•	 Maintaining full functionality of all existing properties in                  Gas
      the DFB                                                                    Electricity
                                                                      Projected figure 7,486,603
•	 Co-ordination of non-routine / emergency works to DFB                       kWhs Per Year
      properties.                                                         3% decrease on 2021

•	 Ensured all locations passed the relevant statuary             CARBON (TONNES) - 2022
      inspections.
                                                                                 1,592
•	 Co-ordinating maintenance contractors to ensure all                          tonnes
      planned maintenance is carried out to the highest
      standards and in line with H&S legislation.                               Gas
                                                                                Electricity
•	 Conduct ongoing reviews and inspection of maintenance           Projected figure 1,839.8 Carbon
      contractors.                                                           (tonnes) Per Year
                                                                          1% decrease on 2021
•	 Processing / Approvals of contractor payments
•	 Identifying future DFB requirements for fire stations and     Over 920

      logistics facilities.                                      maintenance requests
•	 Liaising with other Dublin City Council departments as
                                                                       Over 170
      required, to organise work programmes and respond to
      requests for inspections or related services.                        deemed to require
•	 Supervision of building works carried out under the                     immediate attention
      contract, including budget management and reporting to
      the Assistant Chief Fire Officer.                                                     61
•	 Liaising with Dublin City Council & consultants appointed
      for new works projects in DFB

THE PROPERTY MAINTENANCE
SECTION ADDRESSED:

•	 Over 920 maintenance requests.
•	 Over 170 were deemed to require immediate attention.
•	 A number of medium size renovation projects in various

      locations were carried out.

In conjunction with Dublin City Council’s energy conservation
advisors DFB have exceeded its energy usage reduction target
for its building stock in 2023 with a further 3% reduction in
consumption (KWhs) and a 1% reduction in carbon (tones) these
figures added with last year’s reduction keeps DFB on target
with Dublin City Council’s overall energy reduction targets.

ANNUAL REPORT 2023 Tuarascáil Bhliantúil 2023
   56   57   58   59   60   61   62   63   64   65   66